FACTORY COMPARISON / FIRST ORDER
Compare quotes from up to 3 factories
FREE basic specification and sourcing-requirements review
Eligible first orders may receive up to 3%
Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements. Final savings depend on supplier confirmation, product type and order value.
Line factory numbers onto the same electrical ratings, quantity and delivery scope before treating a price gap as a saving.
Quotes come from factories. Natural Gas Generator Sourcing only restates them on one ledger. A natural gas generator for home brief usually adds enclosure material, noise statement with distance, fuel-pressure assumption, and a listing edition such as UL 2200. Those extras change cost. If enclosure, noise limit or listing scope differs, the gap is a scope gap, not a market-discount figure. We have no same-basis price_comparisons file on this site, so we do not publish a percentage.
If the buyer later changes fuel from natural gas to LP vapor, raises kW, switches from single-phase to three-phase, or adds a quieter enclosure, the first numbers no longer sit on one basis. We ask each factory to restate only the changed lines rather than treating a leftover price as still valid. Controller model, start-up documents and spare lists belong in the scope-of-supply paragraph; omitting them does not make the remaining figure a lower total purchase cost.
Manufacturer family pages often publish kW steps and fuel versions without amperes per voltage or a noise figure. Those missing lines sit on a separate specification sheet, which is the document we ask for. Third-party product pages are rating maps only. They are not our stock, our listing, or a factory appointment. Read option forms and the standby comparison note.
Factory replies set price and timing. This desk does not publish either figure in advance.